hydraulic goods elevator

//hydraulic goods elevator
hydraulic goods elevator 2020-06-05T13:55:09+00:00

Project Description

Hydraulic goods elevator is vertical heavy duty lift platform which is widely used in warehouse, workshop, stores. And it is used to move goods between multiple floor levels quickly and safely. The goods elevator is available in pit installation or no pit installation.

Hydraulic goods elevator is vertical guide rail lift. It is available in variety platform sizes, travel height and capacity to suit the most demanding applications.

Option: enclosed mesh which prevent other man from closing the working lift. 

Safety features:

  • Emergency stop button in all controllers
  • Safe operation voltage
  • Manual down valve
  • Gate lock switch
  • Double top limit switch
  • Chain slack device

Details for the 3t goods elevator with enclosure:

● Elevator type

Heavy duty hydraulic lift SJD3-5

● Capacity

3000kg

● Travel

5m

● Platform

W2950x D2420mm

● Protection rail height

1500mm

● Guide rail

125H-beam

● Speed

4-5m/min

● Drive System

Hydraulic cylinder 2pcs Φ90

● Voltage

Ac 380V/3PH/50HZ or to request

● Power Supply

8kw

● Machine Location

In a cabinet beside the hoist way

● Installation area

W3860*D2740mm

 

The materials of hydraulic goods elevator are from long-time cooperated and tested suppliers. They make the lifts durable and good performance in working.

  • Electric control system
  • control panel of hydraulic goods elevator
  • Main parts
  •  details for hydraulic goods elevator

 

The goods elevator with enclosure is fully assembled in factory and marked the connection of each parts. And there are installation manual pit drawing, installation details show.

Installation steps:

  1. Make a pit as pit drawing show
  2. Fix built-in fittings at right place
  3. Locate platform in pit
  4. Assemble guide rails onto platform
  5. Weld the guide rails on to wall or other structure
  6. Fix enclosure mesh steel structure and connected with lift
  7. Connect the electric lines
  8. Unload test 3-4 times
  9. Load testing

 

Ask for quote